Sunjoy L-GZ339PAL Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 7
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
M6X15 bolt
64 PCS
M6 flat washer
64 PCS
Plastic Hook
144PCS
Hardware Pack 1
STEP 1
Fig.0: Install Plastic hook (DD) to the Beam A (B, C, D) as Fig.0 shows.
8pcs hooks and 10pcs hooks needed on each short beam and long beam
separately.
Fig.1: Connect Long beam (A&B) with Beam connector (E) by using bolt
(AA) and flat washer (BB). Connect short beam (C&D) with Beam
connector (E) in the same way.
Fig.2: Connect the long beams and the short beams with Corner
connector (F) by using bolt (AA) and flat washer (BB). Please block up the
whole beam frame to prevent the damage to the plastic hooks when
assemble. Make sure all snap buttons are in place.
Fig.3: Attach Reinforcement slat (G) to the corner of the beam frame with
bolt (AA) and flat washer (BB).
Fig.4: Install Corner mandril connector (I) on the top of the beam frame (A
& D) corner with bolt (AA) and flat washer (BB). Install Corner mandril
connector (H) on the top of the beam frame (B & C) corner in the same
way.
BB
M6 flat washer
12 PCS
EE
M6X35 bolt
8 PCS
FF
M6 nut
8 PCS
W1
M6 wrench
1 PC
Hardware Pack 2
Page view 2
1 2 3 4 5 6 7

Comments to this Manuals

No comments