FF 6*180 ground stake 16pcs
GG Plastic loop 52pcs
HardwarePack 3
Fig.8 P
ut the main
canopy (M) onto the main
top, do not unfold, then
insert the 2
nd
tier top
pole (E) into the 2
nd
tier top connector(E).
Fig.9 Put the 2
nd
tier
canopy (N) on the 2
nd
tier
top, secure the four
corners to the 2
nd
tier top
pole.
Fig.10 Insert the finial
(P) into the 2
nd
tier top
connector (E).
Fig.11 Insert the 2
nd
tier top pole (F)
into the curve pipe connector (G),
open the main canopy(M),and
secure the canopy to the screens
and beams.